Triple

T1057865
Position Surface form Disambiguated ID Type / Status
Subject North Pacific Gyre E22837 entity
Predicate instanceOf P0 FINISHED
Object current system C6033 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: current system
Context triple: [North Pacific Gyre, instanceOf, current system]
  • A. global operational system
    A global operational system is an integrated framework of processes, technologies, and governance structures that coordinates and manages activities across international boundaries to ensure consistent, efficient, and reliable operations worldwide.
  • B. systems command
    A systems command is an instruction issued to an operating system or runtime environment to perform a specific low-level task such as file manipulation, process control, or configuration management.
  • C. mission system
    A mission system is a coordinated set of processes, tools, and resources designed to plan, execute, monitor, and evaluate the completion of specific operational or strategic objectives.
  • D. public library system
    A public library system is an organized network of libraries, resources, services, and policies that manages the acquisition, cataloging, circulation, and access to informational and cultural materials for a community.
  • E. calendar system
    A calendar system is a structured method for organizing and measuring time into units such as days, weeks, months, and years to schedule, record, and coordinate events.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a493dada0481909c43649f9843ea91 completed March 1, 2026, 7:30 p.m.
Created at: March 1, 2026, 7:42 p.m.