Triple

T10574836
Position Surface form Disambiguated ID Type / Status
Subject Line 9 (Barcelona Metro) E249581 entity
Predicate shortName P43 FINISHED
Object L9 E599000 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: L9 | Statement: [Line 9 (Barcelona Metro), shortName, L9]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: L9
Context triple: [Line 9 (Barcelona Metro), shortName, L9]
  • A. L9 Sud chosen
    L9 Sud is a section of Barcelona's Metro Line 9 that serves the southern metropolitan area, including key connections to the airport and suburban zones.
  • B. L83
    L83 is a 5.3-liter GM EcoTec3 V8 truck engine used in late-model Chevrolet and GMC pickups and SUVs.
  • C. L7
    L7 is an American all-female grunge and punk rock band known for their heavy sound, feminist themes, and prominence in the early 1990s alternative rock scene.
  • D. L86
    L86 is a 6.2-liter GM EcoTec3 V8 gasoline engine used in modern Chevrolet and GMC trucks and SUVs, known for its direct injection, variable valve timing, and cylinder deactivation technologies.
  • E. LE-9
    The LE-9 is a next-generation liquid hydrogen–liquid oxygen rocket engine developed by Japan’s JAXA and Mitsubishi Heavy Industries for the core stage of the H3 launch vehicle, emphasizing high efficiency and cost-effective, reliable operation.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d381c8bd708190acf3d275c908251e completed April 6, 2026, 9:50 a.m.
NER Named-entity recognition batch_69d52749dda08190b0c9627a931c5848 completed April 7, 2026, 3:48 p.m.
NED1 Entity disambiguation (via context triple) batch_69d94b5d89748190bb398943e4a16e9b completed April 10, 2026, 7:11 p.m.
Created at: April 6, 2026, 12:38 p.m.