Triple

T10574685
Position Surface form Disambiguated ID Type / Status
Subject Line 1 (Barcelona Metro) E249578 entity
Predicate alsoKnownAs P39 FINISHED
Object Línia 1 E272651 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Línia 1 | Statement: [Line 1 (Barcelona Metro), alsoKnownAs, Línia 1]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Línia 1
Context triple: [Line 1 (Barcelona Metro), alsoKnownAs, Línia 1]
  • A. Metro Line 1 chosen
    Metro Line 1 is a primary rapid transit route in its city's metro system, serving as a major corridor for passenger travel and interchanges with other lines.
  • B. 1 Line (Link light rail)
    The 1 Line is a light rail line in Sound Transit's Link light rail system serving the Seattle metropolitan area in Washington State.
  • C. Línea 6
    Línea 6 is a modern, fully automated metro line in Santiago, Chile, known for its advanced technology, safety features, and connection between key residential and commercial areas of the city.
  • D. Línea 6
    Línea 6 is a circular line of the Madrid Metro that loops around the city, connecting many major transfer stations and neighborhoods.
  • E. LRT Line 1
    LRT Line 1 is a major elevated urban rail line in Metro Manila, Philippines, forming part of the city’s light rail transit system and serving as a key north–south transport corridor.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d381c8bd708190acf3d275c908251e completed April 6, 2026, 9:50 a.m.
NER Named-entity recognition batch_69d52749dda08190b0c9627a931c5848 completed April 7, 2026, 3:48 p.m.
NED1 Entity disambiguation (via context triple) batch_69d94b5d89748190bb398943e4a16e9b completed April 10, 2026, 7:11 p.m.
Created at: April 6, 2026, 12:38 p.m.