Triple

T10567580
Position Surface form Disambiguated ID Type / Status
Subject Civic Center station E249389 entity
Predicate instanceOf P0 FINISHED
Object MetroLink station C463 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: MetroLink station
Context triple: [Civic Center station, instanceOf, MetroLink station]
  • A. AeroTrain station
    An AeroTrain station is a designated facility where passengers board, disembark, and transfer between AeroTrains, providing platforms, ticketing, waiting areas, and related services for high-speed or automated airport rail transit.
  • B. MARTA rail station
    A MARTA rail station is a designated facility along the Metropolitan Atlanta Rapid Transit Authority’s rail network where passengers access, board, and transfer between trains and related transit services.
  • C. light-rail station
    A light-rail station is a designated facility where light-rail vehicles stop to allow passengers to board, alight, and transfer between services, typically featuring platforms, shelters, signage, and ticketing amenities.
  • D. MARC station
    A MARC station is a designated passenger rail stop along the Maryland Area Regional Commuter (MARC) train network, providing boarding, alighting, and related services for regional commuters.
  • E. rapid transit station chosen
    A rapid transit station is a designated facility where passengers board, alight, and transfer between high-frequency urban rail or metro services, typically featuring platforms, ticketing areas, and access to surrounding streets or other transport modes.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d381c8bd708190acf3d275c908251e completed April 6, 2026, 9:50 a.m.
Created at: April 6, 2026, 12:36 p.m.