Triple

T10559780
Position Surface form Disambiguated ID Type / Status
Subject New Jersey Route 28 E249183 entity
Predicate easternTerminus P388 FINISHED
Object New Jersey Route 27 in Elizabeth, New Jersey
New Jersey Route 27 in Elizabeth, New Jersey is a major state highway segment that serves as a key urban thoroughfare connecting local streets with regional routes in the city of Elizabeth.
E870601 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: New Jersey Route 27 in Elizabeth, New Jersey | Statement: [New Jersey Route 28, easternTerminus, New Jersey Route 27 in Elizabeth, New Jersey]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: New Jersey Route 27 in Elizabeth, New Jersey
Context triple: [New Jersey Route 28, easternTerminus, New Jersey Route 27 in Elizabeth, New Jersey]
  • A. U.S. Route 22 in New Jersey
    U.S. Route 22 in New Jersey is a major east–west highway that serves as a key commuter and commercial corridor linking central and northern New Jersey with the New York City metropolitan area.
  • B. New Jersey Route 21 (nearby via Newark)
    New Jersey Route 21 is a key north–south state highway in northern New Jersey that runs along the Passaic River, connecting Newark with surrounding communities and serving as an important commuter and industrial corridor.
  • C. New Jersey Route 17 in Rutherford
    New Jersey Route 17 in Rutherford is a major north–south state highway segment in Bergen County, New Jersey, serving as a key commercial and commuter corridor with multiple lanes, service roads, and access to regional routes.
  • D. Route 527 (New Jersey)
    Route 527 (New Jersey) is a north–south state highway in central New Jersey that serves as a key local connector through several communities, including Old Bridge Township.
  • E. New Jersey Route 7 in Belleville
    New Jersey Route 7 in Belleville is a state highway segment in Essex County, New Jersey, serving as a local connector route through the township and linking to major nearby roads.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: New Jersey Route 27 in Elizabeth, New Jersey
Triple: [New Jersey Route 28, easternTerminus, New Jersey Route 27 in Elizabeth, New Jersey]
Generated description
New Jersey Route 27 in Elizabeth, New Jersey is a major state highway segment that serves as a key urban thoroughfare connecting local streets with regional routes in the city of Elizabeth.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: New Jersey Route 27 in Elizabeth, New Jersey
Target entity description: New Jersey Route 27 in Elizabeth, New Jersey is a major state highway segment that serves as a key urban thoroughfare connecting local streets with regional routes in the city of Elizabeth.
  • A. U.S. Route 22 in New Jersey
    U.S. Route 22 in New Jersey is a major east–west highway that serves as a key commuter and commercial corridor linking central and northern New Jersey with the New York City metropolitan area.
  • B. New Jersey Route 21 (nearby via Newark)
    New Jersey Route 21 is a key north–south state highway in northern New Jersey that runs along the Passaic River, connecting Newark with surrounding communities and serving as an important commuter and industrial corridor.
  • C. New Jersey Route 17 in Rutherford
    New Jersey Route 17 in Rutherford is a major north–south state highway segment in Bergen County, New Jersey, serving as a key commercial and commuter corridor with multiple lanes, service roads, and access to regional routes.
  • D. Route 527 (New Jersey)
    Route 527 (New Jersey) is a north–south state highway in central New Jersey that serves as a key local connector through several communities, including Old Bridge Township.
  • E. New Jersey Route 7 in Belleville
    New Jersey Route 7 in Belleville is a state highway segment in Essex County, New Jersey, serving as a local connector route through the township and linking to major nearby roads.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d381c8bd708190acf3d275c908251e completed April 6, 2026, 9:50 a.m.
NER Named-entity recognition batch_69d5271f3c6c819080b49fbe3aa09e09 completed April 7, 2026, 3:47 p.m.
NED1 Entity disambiguation (via context triple) batch_69d93486c7288190a2ccb822fc968919 completed April 10, 2026, 5:33 p.m.
NEDg Description generation batch_69d938c979788190b11b02748ed44153 completed April 10, 2026, 5:52 p.m.
NED2 Entity disambiguation (via description) batch_69d9398b63f08190910dd838ad11de6e completed April 10, 2026, 5:55 p.m.
Created at: April 6, 2026, 12:35 p.m.