Triple

T10554844
Position Surface form Disambiguated ID Type / Status
Subject The Ike E249050 entity
Predicate connectsTo P845 FINISHED
Object Interstate 88 E164684 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Interstate 88 | Statement: [The Ike, connectsTo, Interstate 88]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Interstate 88
Context triple: [The Ike, connectsTo, Interstate 88]
  • A. Interstate 88 chosen
    Interstate 88 is a major east–west highway in Illinois that connects the Chicago metropolitan area with the Quad Cities and serves as a key regional transportation corridor.
  • B. Interstate 39
    Interstate 39 is a north–south U.S. Interstate Highway running through Illinois and Wisconsin, serving as a major regional corridor linking cities such as Normal, Rockford, and Wausau.
  • C. Interstate 74
    Interstate 74 is a major east–west U.S. Interstate Highway that runs through multiple Midwestern and Southeastern states, including a segment in North Carolina.
  • D. Interstate 41
    Interstate 41 is a north–south U.S. Interstate Highway running through Wisconsin, connecting the Milwaukee and Green Bay areas and linking with several major routes.
  • E. Interstate 82
    Interstate 82 is a major U.S. highway in the Pacific Northwest that connects central Washington to northeastern Oregon, facilitating regional travel and commerce.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d381c733c08190ab1dd6239f5f34ae completed April 6, 2026, 9:49 a.m.
NER Named-entity recognition batch_69d527118da081909ca61bc555a17609 completed April 7, 2026, 3:47 p.m.
NED1 Entity disambiguation (via context triple) batch_69febfcbbf408190a87f471d2732148b completed May 9, 2026, 5:02 a.m.
Created at: April 6, 2026, 12:34 p.m.