Triple

T10543101
Position Surface form Disambiguated ID Type / Status
Subject Isuzu Elf E248744 entity
Predicate isInProduction P87831 FINISHED
Object true LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: true | Statement: [Isuzu Elf, isInProduction, true]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: isInProduction
Context triple: [Isuzu Elf, isInProduction, true]
  • A. isProductionReady
    Indicates that something has met all necessary quality, stability, and performance criteria to be safely deployed and used in a live production environment.
  • B. productionEnvironment chosen
    Indicates that something is part of, deployed to, or operating within a live production environment as opposed to a test or development setting.
  • C. usesProductionModel
    Indicates that one entity employs or relies on another entity as its primary or official production model in practice.
  • D. hasProductionStatus
    Indicates the current stage or condition of an entity’s production process (e.g., planned, in progress, completed, or discontinued).
  • E. performedInProduction
    Indicates that an entity (such as a person or group) took part as a performer in a specific production or performance event.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d381c733c08190ab1dd6239f5f34ae completed April 6, 2026, 9:49 a.m.
NER Named-entity recognition batch_69d5190f46d08190a92b1191881ffb92 completed April 7, 2026, 2:47 p.m.
PD Predicate disambiguation batch_69d4fb9729288190a0149f127acd7ae3 completed April 7, 2026, 12:41 p.m.
Created at: April 6, 2026, 12:32 p.m.