Triple

T1054176
Position Surface form Disambiguated ID Type / Status
Subject The Incredible Hulk Coaster E22764 entity
Predicate instanceOf P0 FINISHED
Object inverted roller coaster C6016 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: inverted roller coaster
Context triple: [The Incredible Hulk Coaster, instanceOf, inverted roller coaster]
  • A. Ferris wheel
    A Ferris wheel is a large, rotating upright wheel with passenger cabins attached to its rim, providing riders with elevated, circular views of the surrounding area.
  • B. swing ride
    A swing ride is an amusement park attraction where riders sit in suspended chairs that spin around a central tower, often tilting outward to create a flying sensation.
  • C. elevated railway
    An elevated railway is a rail transport system in which tracks and stations are built on raised structures above ground level, typically supported by columns or girders, to avoid interference with street traffic.
  • D. cable car system
    A cable car system is a transportation network in which vehicles are pulled by continuously moving cables, typically used to move people or goods along steep or inaccessible routes such as mountainsides or urban hills.
  • E. people mover system
    A people mover system is an automated transportation network designed to efficiently move passengers over short to medium distances within confined areas such as airports, campuses, or urban centers.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a493da02e081908c13ff5e02a0fe7a completed March 1, 2026, 7:30 p.m.
Created at: March 1, 2026, 7:42 p.m.