Triple
T10534273
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Sevier Air Trampoline and Ninja Warrior Park |
E248522
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | amusement attraction |
C8768
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: amusement attraction Context triple: [Sevier Air Trampoline and Ninja Warrior Park, instanceOf, amusement attraction]
-
A.
amusement park attraction
chosen
An amusement park attraction is a designed entertainment feature or ride that provides guests with thrilling, enjoyable, or immersive experiences within a themed recreational setting.
-
B.
themed entertainment attraction
A themed entertainment attraction is an immersive, story-driven experience that combines environment design, technology, and performance to engage guests in a specific narrative or world.
-
C.
amusement park attraction area
An amusement park attraction area is a designated section within an amusement park that groups together themed rides, games, and entertainment experiences to create a cohesive and immersive visitor environment.
-
D.
adventure park
An adventure park is a recreational facility offering a variety of physically engaging and often adrenaline-inducing outdoor activities, such as zip lines, climbing courses, and obstacle challenges, designed for fun, fitness, and exploration.
-
E.
theme park entertainment
Theme park entertainment encompasses the rides, shows, attractions, and interactive experiences designed to engage and delight visitors within a themed recreational environment.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d381c5c7448190bec34bee7ec72bac |
completed | April 6, 2026, 9:49 a.m. |
Created at: April 6, 2026, 12:31 p.m.