Triple
T10517642
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Center |
E248074
|
entity |
| Predicate | coordinatesWith |
P1140
|
FINISHED |
| Object |
Terminal Radar Approach Control
Terminal Radar Approach Control (TRACON) is an air traffic control facility responsible for managing and sequencing aircraft during the critical phases of arrival and departure in the airspace surrounding major airports using radar.
|
E248073
|
NE FINISHED |
How this triple was built (4 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Terminal Radar Approach Control | Statement: [Center, coordinatesWith, Terminal Radar Approach Control]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Terminal Radar Approach Control Context triple: [Center, coordinatesWith, Terminal Radar Approach Control]
-
A.
Terminal 1
Terminal 1 is one of the main passenger terminals at Shanghai Pudong International Airport, handling a significant share of the airport’s domestic and international flights.
-
B.
Terminal 1
Terminal 1 is a domestic passenger terminal at Sardar Vallabhbhai Patel International Airport in Ahmedabad, India.
-
C.
Terminal 1
Terminal 1 is a major passenger terminal at Chicago O'Hare International Airport, handling a large share of the airport’s domestic and international flights.
-
D.
Terminal 1
Terminal 1 is one of the passenger terminals at Chicago O'Hare International Airport, serving as a major hub facility primarily for United Airlines and its partners.
-
E.
Terminal 1
Terminal 1 is the main international passenger terminal at Bandaranaike International Airport in Sri Lanka, handling most of the airport’s international flight operations.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Terminal Radar Approach Control Triple: [Center, coordinatesWith, Terminal Radar Approach Control]
Generated description
Terminal Radar Approach Control (TRACON) is an air traffic control facility responsible for managing and sequencing aircraft during the critical phases of arrival and departure in the airspace surrounding major airports using radar.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Terminal Radar Approach Control Target entity description: Terminal Radar Approach Control (TRACON) is an air traffic control facility responsible for managing and sequencing aircraft during the critical phases of arrival and departure in the airspace surrounding major airports using radar.
-
A.
Terminal Radar Approach Control
chosen
Terminal Radar Approach Control (TRACON) is an air traffic control facility responsible for managing and sequencing aircraft during the approach, departure, and transition phases within the airspace surrounding major airports using radar.
-
B.
Terminal 1
Terminal 1 is one of the main passenger terminals at Shanghai Pudong International Airport, handling a significant share of the airport’s domestic and international flights.
-
C.
Terminal 1
Terminal 1 is a domestic passenger terminal at Sardar Vallabhbhai Patel International Airport in Ahmedabad, India.
-
D.
Terminal 1
Terminal 1 is a major passenger terminal at Chicago O'Hare International Airport, handling a large share of the airport’s domestic and international flights.
-
E.
Terminal 1
Terminal 1 is one of the passenger terminals at Chicago O'Hare International Airport, serving as a major hub facility primarily for United Airlines and its partners.
- F. None of above.
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d381c4aa948190942e1d803143fb0e |
completed | April 6, 2026, 9:49 a.m. |
| NER | Named-entity recognition | batch_69d509cd0fb8819087de2f9a93bad6e6 |
completed | April 7, 2026, 1:42 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69d90dfbd364819087c70d3b3580eb7a |
completed | April 10, 2026, 2:49 p.m. |
| NEDg | Description generation | batch_69d9107dc8448190998c4044f68a775e |
completed | April 10, 2026, 3 p.m. |
| NED2 | Entity disambiguation (via description) | batch_69d911e7d2dc8190a67b2513607fdf98 |
completed | April 10, 2026, 3:06 p.m. |
Created at: April 6, 2026, 12:28 p.m.