Triple
T10513462
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | GFMD Support Unit |
E247973
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | support structure |
C12438
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: support structure Context triple: [GFMD Support Unit, instanceOf, support structure]
-
A.
support branch
A support branch is a temporary code line created from a stable base to isolate, develop, and deliver urgent fixes or minor updates without disrupting ongoing mainline or feature development.
-
B.
support formation
Support formation is the process of organizing and mobilizing resources, relationships, and structures that provide ongoing assistance, stability, and reinforcement for individuals, groups, or systems.
-
C.
A-frame structure
chosen
An A-frame structure is a simple, triangular building or framework formed by two sloping sides that meet at the top in the shape of the letter "A," providing strong, stable support with minimal materials.
-
D.
component of structure
A component of structure is an individual part or element that, when combined with other components, forms a larger, organized whole within a system or construction.
-
E.
support activity
A support activity is an auxiliary function or process that enables, enhances, or maintains an organization’s primary activities by providing necessary resources, infrastructure, or services.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d381c4aa948190942e1d803143fb0e |
completed | April 6, 2026, 9:49 a.m. |
Created at: April 6, 2026, 12:27 p.m.