Triple

T10502390
Position Surface form Disambiguated ID Type / Status
Subject Soft Capture Mechanism E247702 entity
Predicate installedDuring P37044 FINISHED
Object final Space Shuttle servicing mission to Hubble LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: final Space Shuttle servicing mission to Hubble | Statement: [Soft Capture Mechanism, installedDuring, final Space Shuttle servicing mission to Hubble]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: installedDuring
Context triple: [Soft Capture Mechanism, installedDuring, final Space Shuttle servicing mission to Hubble]
  • A. installedAt
    Indicates that something has been set up, placed, or put into operation at a specific location or site.
  • B. installedBy
    Indicates that one entity was set up, put in place, or made operational through the actions or intervention of another entity.
  • C. installedDuringServicingMission chosen
    Indicates that one entity was installed onto or into another entity specifically as part of a servicing mission.
  • D. installedInstrument
    Indicates that one entity has placed or set up another entity as an instrument or device for use in a particular context or system.
  • E. installedPower
    Indicates the total nominal power capacity that has been set up or equipped for use in a system, device, or facility.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d381c4aa948190942e1d803143fb0e completed April 6, 2026, 9:49 a.m.
NER Named-entity recognition batch_69d5099c6a848190bf1d5361e9e61108 completed April 7, 2026, 1:41 p.m.
PD Predicate disambiguation batch_69d4fb8e24ac8190912c9f11b8bd3084 completed April 7, 2026, 12:41 p.m.
Created at: April 6, 2026, 12:25 p.m.