Triple

T10502171
Position Surface form Disambiguated ID Type / Status
Subject Servicing Mission 4 E247697 entity
Predicate wasFinal P33890 FINISHED
Object last Space Shuttle mission to Hubble Space Telescope LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: last Space Shuttle mission to Hubble Space Telescope | Statement: [Servicing Mission 4, wasFinal, last Space Shuttle mission to Hubble Space Telescope]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: wasFinal
Context triple: [Servicing Mission 4, wasFinal, last Space Shuttle mission to Hubble Space Telescope]
  • A. wasLast chosen
    Indicates that one entity occurred or appeared after all others in a sequence, making it the final item or event.
  • B. finalPhaseOf
    Indicates that one process, stage, or event constitutes the concluding or last phase of another broader process or sequence.
  • C. finalHeld
    Indicates that an entity ultimately retains possession or control of another entity at the conclusion of a process or event.
  • D. finalPassing
    Indicates that an entity successfully completes or passes a final evaluation, test, or stage in a process.
  • E. finalAct
    Indicates that an action or event is the last or concluding act in a sequence or process.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d381c4aa948190942e1d803143fb0e completed April 6, 2026, 9:49 a.m.
NER Named-entity recognition batch_69d5099c6a848190bf1d5361e9e61108 completed April 7, 2026, 1:41 p.m.
PD Predicate disambiguation batch_69d4fb8e24ac8190912c9f11b8bd3084 completed April 7, 2026, 12:41 p.m.
Created at: April 6, 2026, 12:25 p.m.