Triple
T10501975
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Mission Control Centre |
E247693
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | spaceflight facility |
C4504
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: spaceflight facility Context triple: [Mission Control Centre, instanceOf, spaceflight facility]
-
A.
spaceflight center
chosen
A spaceflight center is a facility dedicated to the planning, development, testing, and control of spacecraft and space missions.
-
B.
space launch facility
A space launch facility is a specialized complex equipped with infrastructure, systems, and support services for preparing, launching, and sometimes recovering spacecraft and launch vehicles.
-
C.
spaceport facility
A spaceport facility is a complex of specialized infrastructure and services designed to support the launch, landing, maintenance, and logistical operations of spacecraft and their crews.
-
D.
NASA spaceport
A NASA spaceport is a specialized aerospace facility where NASA prepares, launches, and sometimes recovers spacecraft and launch vehicles for missions into space.
-
E.
space-grant institution
A space-grant institution is a college or university designated under the U.S. National Space Grant College and Fellowship Program to promote education, research, and public outreach in space-related fields.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d381c4aa948190942e1d803143fb0e |
completed | April 6, 2026, 9:49 a.m. |
Created at: April 6, 2026, 12:25 p.m.