Triple

T10498257
Position Surface form Disambiguated ID Type / Status
Subject Eaton Socon E247597 entity
Predicate roadAccess P385 FINISHED
Object A428 road E509220 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: A428 road | Statement: [Eaton Socon, roadAccess, A428 road]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: A428 road
Context triple: [Eaton Socon, roadAccess, A428 road]
  • A. A428 road chosen
    The A428 road is a major route in eastern England connecting Coventry and Cambridge, serving as an important regional link across the Midlands and East Anglia.
  • B. A423 road
    The A423 road is a major route in England that includes the Oxford Ring Road and connects several key towns and transport links in the region.
  • C. A421 road
    The A421 road is a major east–west route in southern England that connects key towns and links the M1 and A1 motorways, serving as an important regional transport corridor.
  • D. A488 road
    The A488 road is a primary route in western England that runs through Shropshire and connects the town of Shrewsbury with various rural communities.
  • E. A420 road
    The A420 road is a major route in southern England linking Bristol and Oxford, passing through towns such as Chippenham and Swindon.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d381c309b88190af78aa681cf6a4c2 completed April 6, 2026, 9:49 a.m.
NER Named-entity recognition batch_69d5098d8ac481909c4adedbc4ad1c03 completed April 7, 2026, 1:41 p.m.
NED1 Entity disambiguation (via context triple) batch_69fd32359c54819098349d7d1c1e454f completed May 8, 2026, 12:45 a.m.
Created at: April 6, 2026, 12:25 p.m.