Triple

T10497246
Position Surface form Disambiguated ID Type / Status
Subject Port of Longview E247568 entity
Predicate partOf P40 FINISHED
Object Columbia River port system
The Columbia River port system is a network of deep-draft and inland ports along the Columbia River that serves as a major gateway for international trade, bulk commodities, and regional economic activity in the Pacific Northwest.
E867183 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Columbia River port system | Statement: [Port of Longview, partOf, Columbia River port system]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Columbia River port system
Context triple: [Port of Longview, partOf, Columbia River port system]
  • A. Puget Sound port system
    The Puget Sound port system is a network of interconnected maritime ports and harbors in Washington State that supports regional trade, shipping, and economic activity along the Puget Sound.
  • B. Columbia–Snake River lock system
    The Columbia–Snake River lock system is a series of navigation locks and dams on the Columbia and Snake Rivers that enables barge traffic deep into the interior Pacific Northwest, supporting regional commerce, irrigation, and hydropower generation.
  • C. Columbia River hydropower system
    The Columbia River hydropower system is an extensive network of dams and generating facilities that provides a major share of the Pacific Northwest’s electricity while also supporting irrigation, navigation, and flood control.
  • D. Port of Cascade Locks
    The Port of Cascade Locks is a public port authority in the Columbia River Gorge that manages marine, industrial, and recreational facilities to support local commerce and tourism in Cascade Locks, Oregon.
  • E. Port of Ilwaco
    Port of Ilwaco is a small Pacific Northwest harbor and marina known for commercial and sport fishing, boating access to the Columbia River and Pacific Ocean, and its waterfront shops and services.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Columbia River port system
Triple: [Port of Longview, partOf, Columbia River port system]
Generated description
The Columbia River port system is a network of deep-draft and inland ports along the Columbia River that serves as a major gateway for international trade, bulk commodities, and regional economic activity in the Pacific Northwest.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Columbia River port system
Target entity description: The Columbia River port system is a network of deep-draft and inland ports along the Columbia River that serves as a major gateway for international trade, bulk commodities, and regional economic activity in the Pacific Northwest.
  • A. Puget Sound port system
    The Puget Sound port system is a network of interconnected maritime ports and harbors in Washington State that supports regional trade, shipping, and economic activity along the Puget Sound.
  • B. Columbia–Snake River lock system
    The Columbia–Snake River lock system is a series of navigation locks and dams on the Columbia and Snake Rivers that enables barge traffic deep into the interior Pacific Northwest, supporting regional commerce, irrigation, and hydropower generation.
  • C. Columbia River hydropower system
    The Columbia River hydropower system is an extensive network of dams and generating facilities that provides a major share of the Pacific Northwest’s electricity while also supporting irrigation, navigation, and flood control.
  • D. Port of Cascade Locks
    The Port of Cascade Locks is a public port authority in the Columbia River Gorge that manages marine, industrial, and recreational facilities to support local commerce and tourism in Cascade Locks, Oregon.
  • E. Port of Ilwaco
    Port of Ilwaco is a small Pacific Northwest harbor and marina known for commercial and sport fishing, boating access to the Columbia River and Pacific Ocean, and its waterfront shops and services.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d381c309b88190af78aa681cf6a4c2 completed April 6, 2026, 9:49 a.m.
NER Named-entity recognition batch_69d5098d8ac481909c4adedbc4ad1c03 completed April 7, 2026, 1:41 p.m.
NED1 Entity disambiguation (via context triple) batch_69d8dcc5816c8190a6a3927797942266 completed April 10, 2026, 11:19 a.m.
NEDg Description generation batch_69d8e8c9d5cc8190a425ed834855bbcd completed April 10, 2026, 12:10 p.m.
NED2 Entity disambiguation (via description) batch_69d901fecee88190999e88ca2e56a516 completed April 10, 2026, 1:58 p.m.
Created at: April 6, 2026, 12:24 p.m.