Triple

T10497205
Position Surface form Disambiguated ID Type / Status
Subject Port of Longview E247568 entity
Predicate instanceOf P0 FINISHED
Object deep-draft marine terminal complex C16149 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: deep-draft marine terminal complex
Context triple: [Port of Longview, instanceOf, deep-draft marine terminal complex]
  • A. coal terminal
    A coal terminal is a specialized facility at a port or rail hub designed for the receipt, storage, handling, and loading or unloading of coal for bulk transportation.
  • B. container terminal complex
    A container terminal complex is a large, integrated facility where containerized cargo is transferred between ships, trucks, and trains, supported by specialized infrastructure, equipment, and logistics services.
  • C. maritime structure chosen
    A maritime structure is a man-made construction located in or near bodies of water, designed to support marine activities such as navigation, transportation, resource extraction, or coastal protection.
  • D. maritime warehouse
    A maritime warehouse is a specialized storage facility located at or near a port, designed to handle, protect, and manage goods transported by sea, including loading, unloading, and temporary holding of cargo.
  • E. petrochemical export terminal
    A petrochemical export terminal is a specialized industrial facility where processed petroleum-based products are stored, handled, and loaded onto ships or other transport modes for international distribution.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d381c309b88190af78aa681cf6a4c2 completed April 6, 2026, 9:49 a.m.
Created at: April 6, 2026, 12:24 p.m.