Triple
T10495614
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Pier 6 |
E247530
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | waterfront park area |
C26361
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: waterfront park area Context triple: [Pier 6, instanceOf, waterfront park area]
-
A.
waterfront public space
chosen
A waterfront public space is a shared, accessible area along a body of water designed for recreation, social interaction, and enjoyment of the natural and urban waterfront environment.
-
B.
waterfront district
A waterfront district is an urban or suburban area located along a body of water, characterized by mixed-use development, public access to the shoreline, and activities centered around recreation, commerce, and scenic views.
-
C.
beachfront park
A beachfront park is a public recreational area located along a shoreline that combines natural coastal features with amenities such as walking paths, picnic areas, and playgrounds for leisure and outdoor activities.
-
D.
lakeside park
A lakeside park is a public recreational area situated along the shore of a lake, offering scenic views, outdoor activities, and natural habitats for visitors to enjoy.
-
E.
marine park area
A marine park area is a designated ocean or coastal zone managed to conserve marine ecosystems and biodiversity while allowing regulated recreation, education, and sometimes sustainable use.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d381c309b88190af78aa681cf6a4c2 |
completed | April 6, 2026, 9:49 a.m. |
Created at: April 6, 2026, 12:24 p.m.