Triple

T10484761
Position Surface form Disambiguated ID Type / Status
Subject Mandy Walker E247266 entity
Predicate hasWorkedWith P9615 FINISHED
Object George Miller E128297 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: George Miller | Statement: [Mandy Walker, hasWorkedWith, George Miller]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: George Miller
Context triple: [Mandy Walker, hasWorkedWith, George Miller]
  • A. George Miller
    George Miller is a key architect and partner at the prominent international architecture firm Pei Cobb Freed & Partners.
  • B. George Miller chosen
    George Miller is an acclaimed Australian filmmaker best known for creating and directing the Mad Max film series and other critically lauded works across genres.
  • C. Michael Phillip Anderson
    Michael Phillip Anderson was a United States Air Force officer and NASA astronaut who served as a mission specialist on the Space Shuttle Columbia and died in the 2003 Columbia disaster.
  • D. Patrick Noyce
    Patrick Noyce is the son of Australian film director Phillip Noyce.
  • E. Peter Weir
    Peter Weir is an acclaimed Australian film director known for influential works such as "Picnic at Hanging Rock," "Dead Poets Society," and "The Truman Show."
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d381c309b88190af78aa681cf6a4c2 completed April 6, 2026, 9:49 a.m.
NER Named-entity recognition batch_69d50968a0bc8190a18ba24eb37431d9 completed April 7, 2026, 1:40 p.m.
NED1 Entity disambiguation (via context triple) batch_69d8dc7fc0cc8190922b7b783d37f542 completed April 10, 2026, 11:18 a.m.
Created at: April 6, 2026, 12:22 p.m.