Triple

T10471823
Position Surface form Disambiguated ID Type / Status
Subject Duplex A86 tunnel E246940 entity
Predicate instanceOf P0 FINISHED
Object motorway tunnel C4139 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: motorway tunnel
Context triple: [Duplex A86 tunnel, instanceOf, motorway tunnel]
  • A. road tunnel chosen
    A road tunnel is an underground or enclosed passageway constructed to allow vehicular traffic to pass through obstacles such as mountains, hills, or urban areas while maintaining a continuous roadway.
  • B. motorway
    A motorway is a high-capacity, multi-lane road designed for fast, long-distance vehicular travel with controlled access and no at-grade intersections.
  • C. transportation tunnel
    A transportation tunnel is an underground or enclosed passageway designed to allow vehicles, trains, or pedestrians to travel safely through or beneath natural or man-made obstacles.
  • D. toll highway
    A toll highway is a high-speed road where drivers must pay a fee, typically at toll booths or electronically, to use the roadway for travel.
  • E. toll road
    A toll road is a roadway for which drivers must pay a fee, typically at designated points or electronically, to use its infrastructure.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d381c16c248190a2fe5b471e584e9c completed April 6, 2026, 9:49 a.m.
Created at: April 6, 2026, 12:20 p.m.