Triple

T10456447
Position Surface form Disambiguated ID Type / Status
Subject dyld E246563 entity
Predicate instanceOf P0 FINISHED
Object executable program C2297 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: executable program
Context triple: [dyld, instanceOf, executable program]
  • A. program chosen
    A program is a structured set of instructions written in a programming language that a computer can execute to perform specific tasks or solve problems.
  • B. execution
    Execution is the process by which a planned set of actions or instructions is carried out to achieve a specific outcome or fulfill a defined intent.
  • C. FIRST program
    A FIRST program is a structured, mentor-guided robotics and STEM education initiative in which student teams design, build, and program robots to compete in challenge-based events while developing technical and teamwork skills.
  • D. experimental program
    An experimental program is a structured, time-bound initiative designed to test new ideas, methods, or interventions under controlled conditions to evaluate their feasibility, effectiveness, and potential for broader implementation.
  • E. public art program
    A public art program is an organized initiative, typically led by a government or institution, that commissions, funds, and manages artworks in public spaces to enhance community identity, cultural expression, and shared environments.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d381c04fe08190957c26c526a3b05a completed April 6, 2026, 9:49 a.m.
Created at: April 6, 2026, 12:18 p.m.