Triple
T10451130
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Iridium satellite system |
E246425
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | mobile satellite service system |
C27745
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: mobile satellite service system Context triple: [Iridium satellite system, instanceOf, mobile satellite service system]
-
A.
geostationary communications satellite
A geostationary communications satellite is a spacecraft positioned in an equatorial orbit that matches Earth's rotation, remaining fixed over one longitude to relay telecommunications signals between ground stations.
-
B.
military satellite
A military satellite is an artificial satellite deployed and operated by armed forces to support defense-related functions such as reconnaissance, communications, navigation, early warning, and targeting.
-
C.
regional navigation satellite system
A regional navigation satellite system is a space-based infrastructure that provides positioning, navigation, and timing services over a specific geographic region rather than globally.
-
D.
satellite-based augmentation system
A satellite-based augmentation system is an overlay to global navigation satellite systems that uses additional satellites and ground stations to provide improved accuracy, integrity, and availability for positioning and navigation services.
-
E.
Global Navigation Satellite System
A Global Navigation Satellite System is a satellite-based infrastructure that provides continuous, worldwide positioning, navigation, and timing services to receivers on or near Earth’s surface.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d381c04fe08190957c26c526a3b05a |
completed | April 6, 2026, 9:49 a.m. |
Created at: April 6, 2026, 12:17 p.m.