Triple

T10447772
Position Surface form Disambiguated ID Type / Status
Subject Grand Canal of the Valley of Mexico E246337 entity
Predicate instanceOf P0 FINISHED
Object flood control infrastructure C16044 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: flood control infrastructure
Context triple: [Grand Canal of the Valley of Mexico, instanceOf, flood control infrastructure]
  • A. flood control facility
    A flood control facility is an engineered structure or system designed to manage, divert, store, or reduce excess water flow to prevent or mitigate flooding in surrounding areas.
  • B. flood control agency
    A flood control agency is an organization responsible for planning, implementing, and managing measures to prevent, mitigate, and respond to flooding in a specific region.
  • C. levee system
    A levee system is an integrated network of embankments, floodwalls, and related structures designed to contain or redirect water to protect land and infrastructure from flooding.
  • D. canal infrastructure chosen
    Canal infrastructure encompasses the engineered systems, structures, and facilities—such as channels, locks, dams, embankments, and control mechanisms—designed to manage and support waterborne transport, irrigation, drainage, and water regulation along artificial waterways.
  • E. water infrastructure
    Water infrastructure encompasses the systems, facilities, and networks designed to source, treat, store, distribute, and manage water and wastewater for human, industrial, and environmental needs.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d381c04fe08190957c26c526a3b05a completed April 6, 2026, 9:49 a.m.
Created at: April 6, 2026, 12:16 p.m.