Triple

T10446190
Position Surface form Disambiguated ID Type / Status
Subject Kentons E246293 entity
Predicate instanceOf P0 FINISHED
Object construction workforce C27740 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: construction workforce
Context triple: [Kentons, instanceOf, construction workforce]
  • A. construction pioneer
    A construction pioneer is an innovative leader who introduces groundbreaking methods, materials, or technologies that significantly advance how the built environment is designed and constructed.
  • B. construction management firm
    A construction management firm is a professional organization that plans, coordinates, and oversees construction projects from inception to completion, ensuring they are delivered on time, within budget, and to specified quality and safety standards.
  • C. construction industry partnership
    A construction industry partnership is a collaborative alliance between contractors, suppliers, designers, and other stakeholders formed to jointly plan, finance, and deliver construction projects more efficiently and profitably.
  • D. group of civil engineers
    A group of civil engineers is a collaborative team of professionals who plan, design, and oversee the construction and maintenance of infrastructure projects such as roads, bridges, buildings, and water systems.
  • E. architectural contractor
    An architectural contractor is a professional or firm responsible for managing and executing the construction of buildings according to architectural designs, specifications, and regulatory requirements.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d381c04fe08190957c26c526a3b05a completed April 6, 2026, 9:49 a.m.
Created at: April 6, 2026, 12:16 p.m.