Triple

T1043699
Position Surface form Disambiguated ID Type / Status
Subject Farnham E22526 entity
Predicate hasRoad P959 FINISHED
Object A325 road E220901 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: A325 road | Statement: [Farnham, hasRoad, A325 road]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: A325 road
Context triple: [Farnham, hasRoad, A325 road]
  • A. A325 road chosen
    The A325 road is a primary route in southern England that connects Farnham in Surrey to the A3 and continues south through towns such as Aldershot and Bordon toward Hampshire.
  • B. A315 road
    The A315 road is a key arterial route in west London that runs from Chiswick through several districts, including Brentford, towards central London.
  • C. A30 road
    The A30 road is a major trunk route in southern England that runs from London through counties including Surrey toward the southwest.
  • D. A308 road
    The A308 road is a significant route in southern England that connects parts of London with towns in Surrey and Berkshire, running near the River Thames and serving both local and through traffic.
  • E. A306 road
    The A306 road is a minor A-road in southwest London connecting the A3 with areas such as Barnes and Hammersmith, serving as a local distributor route across the River Thames corridor.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a493d91478819094cc01fb65564bc1 completed March 1, 2026, 7:30 p.m.
NER Named-entity recognition batch_69a4b8475ab48190848388eea6448cb6 completed March 1, 2026, 10:05 p.m.
NED1 Entity disambiguation (via context triple) batch_69af831c25ec81908fb204000ae1b161 completed March 10, 2026, 2:34 a.m.
Created at: March 1, 2026, 7:42 p.m.