Triple

T10424276
Position Surface form Disambiguated ID Type / Status
Subject Dingyuan E245743 entity
Predicate builder P3143 FINISHED
Object AG Vulcan Stettin E847218 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: AG Vulcan Stettin | Statement: [Dingyuan, builder, AG Vulcan Stettin]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: AG Vulcan Stettin
Context triple: [Dingyuan, builder, AG Vulcan Stettin]
  • A. AG Vulcan Stettin chosen
    AG Vulcan Stettin was a prominent German shipbuilding company based in Stettin, known for constructing major warships and commercial vessels in the late 19th and early 20th centuries.
  • B. Kaiserliche Werft Danzig
    Kaiserliche Werft Danzig was a major Imperial German Navy shipyard in Danzig (now Gdańsk, Poland) that constructed warships and submarines for Germany before and during World War I.
  • C. SS Dresden
    SS Dresden was a German passenger steamer best known as the ship from which engineer Rudolf Diesel mysteriously disappeared in 1913.
  • D. SS Teutonic
    SS Teutonic was a late 19th-century British ocean liner notable for being one of the first modern steamships built for both passenger service and potential auxiliary naval use.
  • E. Emden
    Emden is a historic port city in northwestern Germany known for its maritime industry and location near the North Sea.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d381bf3dc08190bf35a2643e4e8f22 completed April 6, 2026, 9:49 a.m.
NER Named-entity recognition batch_69d4ea47a6408190a87b32760692487f completed April 7, 2026, 11:28 a.m.
NED1 Entity disambiguation (via context triple) batch_69d7fc2160208190b6384190d9537df4 completed April 9, 2026, 7:21 p.m.
Created at: April 6, 2026, 12:12 p.m.