Triple
T10412079
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | HAECO |
E245415
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | aircraft maintenance company |
C28044
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: aircraft maintenance company Context triple: [HAECO, instanceOf, aircraft maintenance company]
-
A.
aviation management company
An aviation management company oversees and coordinates aircraft operations, maintenance, crew, regulatory compliance, and related services to ensure safe, efficient, and cost-effective aviation activities for clients.
-
B.
military aviation maintenance organization
A military aviation maintenance organization is a structured unit responsible for inspecting, repairing, servicing, and ensuring the airworthiness and mission readiness of military aircraft and related systems.
-
C.
aircraft engine manufacturer
An aircraft engine manufacturer is a company that designs, develops, produces, and supports engines specifically for use in airplanes and other aircraft.
-
D.
ground handling company
A ground handling company is a service provider that manages aircraft and passenger support operations at airports, including baggage handling, ramp services, check-in, and aircraft servicing on the ground.
-
E.
aircraft leasing company
An aircraft leasing company is a business that purchases aircraft and leases them to airlines or other operators, managing financing, contracts, and often maintenance arrangements to optimize fleet utilization and investment returns.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d381be340c8190b05998703d42d224 |
completed | April 6, 2026, 9:49 a.m. |
Created at: April 6, 2026, 12:10 p.m.