Triple

T10411000
Position Surface form Disambiguated ID Type / Status
Subject Barmouth Beach E245386 entity
Predicate near P350 FINISHED
Object Barmouth railway station E249093 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Barmouth railway station | Statement: [Barmouth Beach, near, Barmouth railway station]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Barmouth railway station
Context triple: [Barmouth Beach, near, Barmouth railway station]
  • A. Barmouth railway station chosen
    Barmouth railway station is a coastal train station in Gwynedd, Wales, providing passenger rail services to the seaside town of Barmouth on the Cambrian Coast Line.
  • B. Beddgelert station
    Beddgelert station is a heritage railway stop in the village of Beddgelert in Snowdonia, Wales, serving passengers on the scenic Welsh Highland Railway.
  • C. Llanberis station
    Llanberis station is the lower terminus and main departure point of the Snowdon Mountain Railway in Gwynedd, Wales.
  • D. Conwy railway station
    Conwy railway station is a small stop on the North Wales Coast Line serving the historic walled town of Conwy in Wales.
  • E. Tywyn railway station
    Tywyn railway station is a small coastal railway stop in Gwynedd, Wales, serving the town of Tywyn on the Cambrian Line.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d381be340c8190b05998703d42d224 completed April 6, 2026, 9:49 a.m.
NER Named-entity recognition batch_69d4e9fc72d081908d81c71133973daf completed April 7, 2026, 11:26 a.m.
NED1 Entity disambiguation (via context triple) batch_69d9987838ac8190a6ba09305fc27621 completed April 11, 2026, 12:40 a.m.
Created at: April 6, 2026, 12:09 p.m.