Triple

T10408431
Position Surface form Disambiguated ID Type / Status
Subject Shanghai–Chongming–Jiangsu tunnel-bridge E245325 entity
Predicate instanceOf P0 FINISHED
Object tunnel-bridge system C15053 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: tunnel-bridge system
Context triple: [Shanghai–Chongming–Jiangsu tunnel-bridge, instanceOf, tunnel-bridge system]
  • A. bridge–tunnel complex chosen
    A bridge–tunnel complex is an integrated transportation structure that combines bridge spans and underwater tunnels to carry traffic across wide bodies of water or other large obstacles.
  • B. combined road and rail bridge–tunnel
    A combined road and rail bridge–tunnel is a hybrid transportation structure that integrates both bridge and tunnel segments to carry vehicular and rail traffic across or under a geographic obstacle such as a body of water or valley.
  • C. toll bridge system
    A toll bridge system is a coordinated set of hardware, software, and procedures that manages vehicle identification, fee calculation, payment processing, and access control for crossing a bridge.
  • D. tunneling system
    A tunneling system is a conceptual framework or infrastructure that enables data, particles, or signals to pass through barriers or intermediate layers via a protected or probabilistic pathway without directly traversing the intervening space in a conventional manner.
  • E. toll bridge
    A toll bridge is a bridge where users must pay a fee to cross, typically to fund its construction, maintenance, or operation.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d381be340c8190b05998703d42d224 completed April 6, 2026, 9:49 a.m.
Created at: April 6, 2026, 12:09 p.m.