Triple
T10398710
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Sirdal municipality |
E245086
|
entity |
| Predicate | partOfHydropowerSystem |
P840
|
FINISHED |
| Object | Sira-Kvina hydropower system |
E823882
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Sira-Kvina hydropower system | Statement: [Sirdal municipality, partOfHydropowerSystem, Sira-Kvina hydropower system]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Sira-Kvina hydropower system Context triple: [Sirdal municipality, partOfHydropowerSystem, Sira-Kvina hydropower system]
-
A.
Sira-Kvina hydropower system
chosen
The Sira-Kvina hydropower system is a major Norwegian hydroelectric power complex that harnesses the Sira and Kvina river systems through multiple dams, reservoirs, and power stations to generate renewable energy.
-
B.
Lule River hydropower system
The Lule River hydropower system is a major network of dams, reservoirs, and power stations in northern Sweden that harnesses the Lule River’s flow to generate a significant share of the country’s hydroelectric power.
-
C.
Kurpsai Hydroelectric Power Plant
Kurpsai Hydroelectric Power Plant is a major hydroelectric facility in Kyrgyzstan that generates electricity by harnessing the flow of the Naryn River.
-
D.
Almatti Hydroelectric Power Station
Almatti Hydroelectric Power Station is a major dam-based power facility in Karnataka, India, that generates electricity from the waters of the Krishna River.
-
E.
Fierza Hydroelectric Power Station
Fierza Hydroelectric Power Station is a major hydroelectric facility in northern Albania, forming part of the Drin River cascade and serving as one of the country’s largest sources of electricity.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d381b5116081908d85227bab6d3c0c |
completed | April 6, 2026, 9:49 a.m. |
| NER | Named-entity recognition | batch_69d4e9d1f2408190beaa8197641c66b4 |
completed | April 7, 2026, 11:26 a.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69d89f6fbc848190806d50bfad654b27 |
completed | April 10, 2026, 6:57 a.m. |
Created at: April 6, 2026, 12:07 p.m.