Triple

T10396761
Position Surface form Disambiguated ID Type / Status
Subject The Tunnel: Sabotage E245040 entity
Predicate precededBy P97 FINISHED
Object The Tunnel (series 1) E245035 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: The Tunnel (series 1) | Statement: [The Tunnel: Sabotage, precededBy, The Tunnel (series 1)]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: The Tunnel (series 1)
Context triple: [The Tunnel: Sabotage, precededBy, The Tunnel (series 1)]
  • A. The Tunnel chosen
    The Tunnel is a British-French crime drama television series that adapts the Scandinavian show The Bridge, centering on a joint investigation into murders discovered in the Channel Tunnel.
  • B. The Tunnel
    The Tunnel is a 1935 British science fiction film envisioning the construction of a transatlantic tunnel linking Europe and America.
  • C. the Tunnels
    The Tunnels are an underground, hidden community beneath New York City where outcasts live in secrecy and form a close-knit, almost mythic society in the TV series "Beauty and the Beast."
  • D. The Tunnel: Sabotage
    The Tunnel: Sabotage is the second series of the British-French crime drama "The Tunnel," following cross-border detectives as they investigate a deadly terrorist plot spanning the Channel.
  • E. Tunnel No. 1
    Tunnel No. 1 is a major water-supply tunnel that forms part of New York City’s underground distribution system.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d381b5116081908d85227bab6d3c0c completed April 6, 2026, 9:49 a.m.
NER Named-entity recognition batch_69d4e9cf79348190975d6c1791e3b621 completed April 7, 2026, 11:26 a.m.
NED1 Entity disambiguation (via context triple) batch_69d795cf331c8190b35caf3997dc29a3 completed April 9, 2026, 12:04 p.m.
Created at: April 6, 2026, 12:06 p.m.