Triple
T10375974
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | APRR |
E244508
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | transport infrastructure company |
C6404
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: transport infrastructure company Context triple: [APRR, instanceOf, transport infrastructure company]
-
A.
transport infrastructure operator
chosen
A transport infrastructure operator is an entity responsible for managing, maintaining, and regulating transportation networks and facilities such as roads, railways, ports, or airports to ensure safe and efficient movement of people and goods.
-
B.
transportation network company
A transportation network company is a business that uses digital platforms, typically mobile apps, to connect passengers with drivers who provide on-demand transportation services.
-
C.
rail transport company
A rail transport company is an organization that owns, operates, or manages trains and railway infrastructure to provide freight and/or passenger transportation services.
-
D.
transportation services company
A transportation services company is an organization that plans, manages, and operates the movement of people or goods using various modes of transport, such as road, rail, air, or sea, often providing logistics, scheduling, and support services.
-
E.
private railway company
A private railway company is a non-governmental business entity that owns, operates, or manages rail transport services for passengers and/or freight, typically for profit under regulatory oversight.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d381b3e328819094b23b8edcd29b5a |
completed | April 6, 2026, 9:49 a.m. |
Created at: April 6, 2026, 12:02 p.m.