Triple

T10360716
Position Surface form Disambiguated ID Type / Status
Subject Claerwen Reservoir E244124 entity
Predicate hasPart P35 FINISHED
Object Claerwen Dam E854780 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Claerwen Dam | Statement: [Claerwen Reservoir, hasPart, Claerwen Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Claerwen Dam
Context triple: [Claerwen Reservoir, hasPart, Claerwen Dam]
  • A. Claerwen Dam chosen
    Claerwen Dam is a large concrete gravity dam in mid-Wales, forming part of the Elan Valley reservoir system that supplies water to Birmingham.
  • B. Cluny Dam
    Cluny Dam is a hydroelectric dam on Tasmania’s Derwent River that forms part of the state’s power generation and water management system.
  • C. Saville Dam
    Saville Dam is a large masonry dam in Barkhamsted, Connecticut, that creates the Barkhamsted Reservoir, a major water supply source for the Hartford area.
  • D. Derwent Dam
    Derwent Dam is a large historic masonry dam in Derbyshire, England, best known for its role in World War II RAF "Dambusters" training and as a prominent feature of the Upper Derwent Valley.
  • E. Keswick Dam
    Keswick Dam is a concrete gravity dam on the Sacramento River in Northern California that regulates flows and generates hydroelectric power as part of the region’s large federal water management system.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d381b22b8c8190aaed476be5f872a9 completed April 6, 2026, 9:49 a.m.
NER Named-entity recognition batch_69d4e96209548190957368ee8c6a9ec3 completed April 7, 2026, 11:24 a.m.
NED1 Entity disambiguation (via context triple) batch_69dbac97ce2481908ea11d6290a9bf2f completed April 12, 2026, 2:30 p.m.
Created at: April 6, 2026, 11:59 a.m.