Triple

T10354665
Position Surface form Disambiguated ID Type / Status
Subject 93rd Academy Awards E243967 entity
Predicate eligibilityPeriodExtendedUntil P32455 FINISHED
Object 2021-02-28 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 2021-02-28 | Statement: [93rd Academy Awards, eligibilityPeriodExtendedUntil, 2021-02-28]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: eligibilityPeriodExtendedUntil
Context triple: [93rd Academy Awards, eligibilityPeriodExtendedUntil, 2021-02-28]
  • A. eligibilityPeriod
    Indicates the span of time during which an entity qualifies for or is allowed to receive a particular benefit, service, or status.
  • B. extensionEffectiveDate chosen
    Indicates the date on which an extension to an existing agreement, term, or condition becomes effective.
  • C. extendedSupportEndDate
    Indicates the date on which an extended support period for something ends.
  • D. eligibilityPeriodStartYear
    Indicates the calendar year in which an entity’s eligibility period begins.
  • E. holderEndDate
    Indicates the date on which an entity’s role as holder of something (e.g., an asset, position, or right) comes to an end.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d381b22b8c8190aaed476be5f872a9 completed April 6, 2026, 9:49 a.m.
NER Named-entity recognition batch_69d4e952c878819084e5d7a593a3f9e9 completed April 7, 2026, 11:24 a.m.
PD Predicate disambiguation batch_69d4dfa657f481909cc5cc8fec00ad19 completed April 7, 2026, 10:42 a.m.
Created at: April 6, 2026, 11:58 a.m.