Triple

T1034988
Position Surface form Disambiguated ID Type / Status
Subject Operation Gothic Serpent E22340 entity
Predicate instanceOf P0 FINISHED
Object special operations mission C340 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: special operations mission
Context triple: [Operation Gothic Serpent, instanceOf, special operations mission]
  • A. military operation chosen
    A military operation is a coordinated and planned set of actions conducted by armed forces to achieve specific strategic, operational, or tactical objectives.
  • B. mission system
    A mission system is a coordinated set of processes, tools, and resources designed to plan, execute, monitor, and evaluate the completion of specific operational or strategic objectives.
  • C. spymaster
    A spymaster is a covert operations leader who orchestrates intelligence gathering, manages networks of agents, and strategically manipulates information to influence events from the shadows.
  • D. multinational mission mechanism
    A multinational mission mechanism is a structured framework of processes, agreements, and coordinating bodies that enables multiple countries or organizations to collaboratively plan, resource, and execute a shared mission across borders.
  • E. paramilitary organization
    A paramilitary organization is a structured group that operates with military-style training, hierarchy, and tactics but is not formally part of a recognized state's official armed forces.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a493d848848190aed4011b34b2e8d3 completed March 1, 2026, 7:30 p.m.
Created at: March 1, 2026, 7:41 p.m.