Triple

T10348355
Position Surface form Disambiguated ID Type / Status
Subject Metro Hidalgo station E243812 entity
Predicate connectsLine P845 FINISHED
Object Line 3 (Olive Green Line) E47977 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Line 3 (Olive Green Line) | Statement: [Metro Hidalgo station, connectsLine, Line 3 (Olive Green Line)]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Line 3 (Olive Green Line)
Context triple: [Metro Hidalgo station, connectsLine, Line 3 (Olive Green Line)]
  • A. Line 3–Red
    Line 3–Red is one of the busiest and most important lines of the São Paulo Metro, running east–west across the city and connecting key residential and commercial areas.
  • B. Metro Line 3 chosen
    Metro Line 3 is a major Mexico City Metro route that runs north–south across the city, connecting key residential and commercial areas including the Gustavo A. Madero borough.
  • C. Line 2–Green
    Line 2–Green is a major rapid transit line of the São Paulo Metro system, serving key central and eastern districts of São Paulo, Brazil.
  • D. Line 3A
    Line 3A is a planned rapid transit route of the Ho Chi Minh City Metro intended to serve as part of the city’s future urban rail network.
  • E. Line 3B
    Line 3B is a planned rapid transit route of the Ho Chi Minh City Metro intended to expand urban rail connectivity in Vietnam’s largest city.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d381b22b8c8190aaed476be5f872a9 completed April 6, 2026, 9:49 a.m.
NER Named-entity recognition batch_69d4e945d51881908dd2af6c78344c9b completed April 7, 2026, 11:23 a.m.
NED1 Entity disambiguation (via context triple) batch_69d7508e325c8190a88c2b972f8a6846 completed April 9, 2026, 7:09 a.m.
Created at: April 6, 2026, 11:56 a.m.