Triple
T10330652
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Pierrelatte |
E242863
|
entity |
| Predicate | near |
P350
|
FINISHED |
| Object | Tricastin nuclear complex |
E242868
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Tricastin nuclear complex | Statement: [Pierrelatte, near, Tricastin nuclear complex]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Tricastin nuclear complex Context triple: [Pierrelatte, near, Tricastin nuclear complex]
-
A.
Tricastin
chosen
Tricastin is a historical and wine-producing region in southeastern France, known for its vineyards and the nearby Tricastin Nuclear Power Plant.
-
B.
CEA Marcoule
CEA Marcoule is a major French nuclear research and industrial site focused on nuclear energy technologies, fuel cycle activities, and radioactive waste management.
-
C.
Flamanville 3 nuclear power plant
Flamanville 3 nuclear power plant is a French EPR (European Pressurized Reactor) project on the Normandy coast, known for its advanced reactor design, major construction delays, and significant cost overruns.
-
D.
Philippsburg Nuclear Power Plant
Philippsburg Nuclear Power Plant was a now-decommissioned nuclear power station in Baden-Württemberg, Germany, that played a significant role in the country’s electricity generation before its shutdown under the German nuclear phase-out policy.
-
E.
Fessenheim hydroelectric power station
Fessenheim hydroelectric power station is a run-of-river hydroelectric facility on the Rhine in eastern France, known for generating renewable electricity via the Grand Canal d’Alsace.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d381af787481908bc401325c760a88 |
completed | April 6, 2026, 9:49 a.m. |
| NER | Named-entity recognition | batch_69d4d7fb77348190ac8ff887f6f03450 |
completed | April 7, 2026, 10:10 a.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69d7504679ec8190926d2c5016653cea |
completed | April 9, 2026, 7:07 a.m. |
Created at: April 6, 2026, 11:52 a.m.