Triple

T10310200
Position Surface form Disambiguated ID Type / Status
Subject New York City Water Tunnel No. 3 E241866 entity
Predicate designedToAllowShutdownOf P93301 FINISHED
Object New York City Water Tunnel No. 1 E236140 NE FINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: New York City Water Tunnel No. 1 | Statement: [New York City Water Tunnel No. 3, designedToAllowShutdownOf, New York City Water Tunnel No. 1]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: New York City Water Tunnel No. 1
Context triple: [New York City Water Tunnel No. 3, designedToAllowShutdownOf, New York City Water Tunnel No. 1]
  • A. New York City Water Tunnel No. 1 chosen
    New York City Water Tunnel No. 1 is a major underground aqueduct that transports drinking water from upstate reservoirs to New York City.
  • B. New York City Water Tunnel No. 2
    New York City Water Tunnel No. 2 is a major underground aqueduct that transports drinking water from upstate reservoirs to the city as part of its extensive water distribution network.
  • C. New York City Water Tunnel No. 3
    New York City Water Tunnel No. 3 is a massive, long-term infrastructure project designed to modernize and provide redundancy to New York City’s drinking water distribution network.
  • D. New York City water tunnels
    New York City water tunnels are a vast underground aqueduct system that conveys drinking water from upstate reservoirs to the city’s distribution network.
  • E. Catskill Aqueduct
    The Catskill Aqueduct is a major component of New York City's water supply system, transporting drinking water from the Catskill Mountains to the city and its reservoirs.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: designedToAllowShutdownOf
Context triple: [New York City Water Tunnel No. 3, designedToAllowShutdownOf, New York City Water Tunnel No. 1]
  • A. shutdownCapability
    Indicates the ability or permission for one entity to power off, deactivate, or terminate the operation of another entity or system.
  • B. canTerminate
    Indicates that one entity has the authority or ability to end or discontinue another entity, process, or relationship.
  • C. permanentShutdown
    Indicates that an entity has been irreversibly taken out of operation and will not be restarted or resumed in the future.
  • D. firstLongShutdown
    Indicates the first occurrence of a prolonged shutdown event affecting the referenced entity or system.
  • E. shutdownPeriod
    Indicates a time interval during which a system, service, or process is intentionally turned off or not operational.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d381ac38808190a8ca7457c85b625b completed April 6, 2026, 9:49 a.m.
NER Named-entity recognition batch_69d4d7ccb7ec8190a538cf279e48116e completed April 7, 2026, 10:09 a.m.
NED1 Entity disambiguation (via context triple) batch_69d7502f7b308190aaefd62f2f8a0ac3 completed April 9, 2026, 7:07 a.m.
PD Predicate disambiguation batch_69d4d1f4f354819080b4ed4bc61bdff6 completed April 7, 2026, 9:44 a.m.
PDg Predicate description generation batch_69d4d7cada7881908beba55a1dc9ecb9 completed April 7, 2026, 10:09 a.m.
Created at: April 6, 2026, 11:47 a.m.