Triple

T10295554
Position Surface form Disambiguated ID Type / Status
Subject Zimbabwe–Zambia border E241475 entity
Predicate hasDamStructure P62654 FINISHED
Object Kariba Dam E343315 NE FINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Kariba Dam | Statement: [Zimbabwe–Zambia border, hasDamStructure, Kariba Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Kariba Dam
Context triple: [Zimbabwe–Zambia border, hasDamStructure, Kariba Dam]
  • A. Kariba Dam chosen
    Kariba Dam is a massive hydroelectric dam on the Zambezi River between Zambia and Zimbabwe, forming one of the world’s largest man-made lakes and serving as a key source of power for the region.
  • B. Batoka Gorge
    Batoka Gorge is a steep, rugged chasm carved by the Zambezi River just downstream of Victoria Falls on the border between Zambia and Zimbabwe.
  • C. Kafue Gorge Dam
    Kafue Gorge Dam is a major hydroelectric power facility on the Kafue River in Zambia, providing a significant portion of the country’s electricity supply.
  • D. Diama Dam
    Diama Dam is a low-head dam on the lower Senegal River near the Senegal–Mauritania border, built primarily to prevent saltwater intrusion and support irrigation and navigation in the region.
  • E. Roseires Dam
    Roseires Dam is a major hydroelectric and irrigation dam on the Blue Nile in Sudan, crucial for water storage, power generation, and flood control in the region.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: hasDamStructure
Context triple: [Zimbabwe–Zambia border, hasDamStructure, Kariba Dam]
  • A. hasLockAndDamSystem
    Indicates that one entity possesses or is equipped with a system of locks and dams used to control water levels and facilitate navigation.
  • B. hasBridgeOrStructure
    Indicates that there exists a bridge or similar structural connection between the related entities.
  • C. numberOfDams
    Indicates the quantity of dams associated with or present in a given entity or context.
  • D. hasAqueduct
    Indicates that one entity possesses, contains, or is equipped with an aqueduct that serves or passes through it.
  • E. hasWaterManagementStructure chosen
    Indicates that one entity possesses, contains, or is associated with a built feature used to control, store, convey, or manage water.
  • F. None of above.

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d381aaafc08190af475ef58dc16aba completed April 6, 2026, 9:49 a.m.
NER Named-entity recognition batch_69d4d2ea9b3c8190b11518b259d5825c completed April 7, 2026, 9:48 a.m.
NED1 Entity disambiguation (via context triple) batch_69d794d34978819083ce709fa2dcaca7 completed April 9, 2026, noon
PD Predicate disambiguation batch_69d4d1f35e548190be3b4d92d65d2d20 completed April 7, 2026, 9:44 a.m.
Created at: April 6, 2026, 11:43 a.m.