Triple

T1025805
Position Surface form Disambiguated ID Type / Status
Subject Biscayne Bay E22135 entity
Predicate crossedBy P416 FINISHED
Object Broad Causeway E71739 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Broad Causeway | Statement: [Biscayne Bay, crossedBy, Broad Causeway]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Broad Causeway
Context triple: [Biscayne Bay, crossedBy, Broad Causeway]
  • A. West Causeway
    West Causeway is a scenic, tree-lined walkway in Beijing’s Summer Palace that stretches across Kunming Lake, offering views of the park’s classical Chinese gardens and pavilions.
  • B. Liverpool Road
    Liverpool Road is a historic street in Manchester, England, notable for its association with one of the world’s oldest surviving passenger railway stations.
  • C. Julia Tuttle Causeway chosen
    The Julia Tuttle Causeway is a major highway bridge in Miami, Florida, that carries Interstate 195 across Biscayne Bay, linking mainland Miami with Miami Beach.
  • D. Amador Causeway
    Amador Causeway is a scenic coastal roadway and recreational area in Panama City that connects the mainland to several Pacific islands and offers views of the Panama Canal and city skyline.
  • E. Dike Road
    Dike Road is a local access route that leads to and provides entry to the coastal Poucha Pond area.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a493d6e380819097b384986ffc315c completed March 1, 2026, 7:30 p.m.
NER Named-entity recognition batch_69a4b7f5e7b48190b26524573c2824ba completed March 1, 2026, 10:04 p.m.
NED1 Entity disambiguation (via context triple) batch_69ac4c15bb8481909ba68f5807581b18 completed March 7, 2026, 4:02 p.m.
Created at: March 1, 2026, 7:41 p.m.