Triple
T10257771
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Arun River |
E240516
|
entity |
| Predicate | hasHydropowerProject |
P15311
|
FINISHED |
| Object |
Upper Arun Hydroelectric Project
The Upper Arun Hydroelectric Project is a planned large-scale hydropower development in eastern Nepal designed to harness the energy of the Arun River for electricity generation.
|
E854145
|
NE FINISHED |
How this triple was built (4 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Upper Arun Hydroelectric Project | Statement: [Arun River, hasHydropowerProject, Upper Arun Hydroelectric Project]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Upper Arun Hydroelectric Project Context triple: [Arun River, hasHydropowerProject, Upper Arun Hydroelectric Project]
-
A.
Nachtigal Hydropower Project
The Nachtigal Hydropower Project is a major hydroelectric dam and power station in Cameroon designed to significantly boost the country’s electricity generation capacity.
-
B.
Shimsha Hydroelectric Project
Shimsha Hydroelectric Project is one of Karnataka’s early hydroelectric power stations, built on the Shimsha River to generate electricity using its water flow.
-
C.
Teesta V Hydroelectric Project
Teesta V Hydroelectric Project is a major hydroelectric power station in Sikkim, India, harnessing the Teesta River to generate electricity for the region.
-
D.
Bassi Hydroelectric Project
Bassi Hydroelectric Project is a hydroelectric power station in Himachal Pradesh, India, that generates electricity using the waters of the Uhl River.
-
E.
Ujjani Hydroelectric Project
Ujjani Hydroelectric Project is a power-generating facility in Maharashtra, India, that harnesses the water stored by the Ujjani Dam to produce hydroelectric energy.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Upper Arun Hydroelectric Project Triple: [Arun River, hasHydropowerProject, Upper Arun Hydroelectric Project]
Generated description
The Upper Arun Hydroelectric Project is a planned large-scale hydropower development in eastern Nepal designed to harness the energy of the Arun River for electricity generation.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Upper Arun Hydroelectric Project Target entity description: The Upper Arun Hydroelectric Project is a planned large-scale hydropower development in eastern Nepal designed to harness the energy of the Arun River for electricity generation.
-
A.
Nachtigal Hydropower Project
The Nachtigal Hydropower Project is a major hydroelectric dam and power station in Cameroon designed to significantly boost the country’s electricity generation capacity.
-
B.
Shimsha Hydroelectric Project
Shimsha Hydroelectric Project is one of Karnataka’s early hydroelectric power stations, built on the Shimsha River to generate electricity using its water flow.
-
C.
Teesta V Hydroelectric Project
Teesta V Hydroelectric Project is a major hydroelectric power station in Sikkim, India, harnessing the Teesta River to generate electricity for the region.
-
D.
Bassi Hydroelectric Project
Bassi Hydroelectric Project is a hydroelectric power station in Himachal Pradesh, India, that generates electricity using the waters of the Uhl River.
-
E.
Ujjani Hydroelectric Project
Ujjani Hydroelectric Project is a power-generating facility in Maharashtra, India, that harnesses the water stored by the Ujjani Dam to produce hydroelectric energy.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d381a7e198819090280d5ab885d59e |
completed | April 6, 2026, 9:49 a.m. |
| NER | Named-entity recognition | batch_69d4d24de4588190b68fb3daa36dbd7d |
completed | April 7, 2026, 9:45 a.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69d6f7e153b0819084708b6f7127cdea |
completed | April 9, 2026, 12:50 a.m. |
| NEDg | Description generation | batch_69d6fcab0bfc8190b47bc165ef3eb15d |
completed | April 9, 2026, 1:11 a.m. |
| NED2 | Entity disambiguation (via description) | batch_69d70fc3b15081908d1b67a7094c6210 |
completed | April 9, 2026, 2:32 a.m. |
Created at: April 6, 2026, 11:31 a.m.