Triple

T10256384
Position Surface form Disambiguated ID Type / Status
Subject Columbia Turnpike E240478 entity
Predicate hasIntersectionWith P13379 FINISHED
Object Eisenhower Parkway E989907 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Eisenhower Parkway | Statement: [Columbia Turnpike, hasIntersectionWith, Eisenhower Parkway]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Eisenhower Parkway
Context triple: [Columbia Turnpike, hasIntersectionWith, Eisenhower Parkway]
  • A. Eisenhower Parkway chosen
    Eisenhower Parkway is a major roadway in New Jersey that serves as a key north–south connector in Essex County’s suburban highway network.
  • B. Lincoln Parkway
    Lincoln Parkway is a historic, tree-lined boulevard in Buffalo, New York, that forms part of the city’s Olmsted-designed park and parkway system.
  • C. Skyline Parkway
    Skyline Parkway is a scenic roadway in Duluth, Minnesota, known for its sweeping views of Lake Superior and the surrounding landscape.
  • D. Shepherd Parkway
    Shepherd Parkway is a wooded national park area in Washington, D.C., known for its Civil War-era fort sites, forested trails, and protection of urban green space.
  • E. Lauzon Parkway
    Lauzon Parkway is a major north–south arterial road in Windsor, Ontario, connecting residential, commercial, and industrial areas to key regional routes.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d381a7e198819090280d5ab885d59e completed April 6, 2026, 9:49 a.m.
NER Named-entity recognition batch_69d4d24d299881909615872e2777bdea completed April 7, 2026, 9:45 a.m.
NED1 Entity disambiguation (via context triple) batch_69f67c5a9dc881909b695f7e87dfcdf6 completed May 2, 2026, 10:36 p.m.
Created at: April 6, 2026, 11:30 a.m.