Triple

T10243638
Position Surface form Disambiguated ID Type / Status
Subject Focke-Wulf Fw 62 E243661 entity
Predicate instanceOf P0 FINISHED
Object military aircraft prototype C6075 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: military aircraft prototype
Context triple: [Focke-Wulf Fw 62, instanceOf, military aircraft prototype]
  • A. experimental aircraft chosen
    An experimental aircraft is a prototype or testbed airplane designed and operated to evaluate new aerodynamic concepts, materials, systems, or technologies outside standard certified production models.
  • B. military aircraft
    A military aircraft is a powered flying vehicle specifically designed, equipped, and operated by armed forces to conduct combat, support, reconnaissance, or training missions in defense and warfare operations.
  • C. unbuilt aircraft project
    An unbuilt aircraft project is a conceptual or proposed airplane design that was planned and possibly studied or partially developed but never constructed or flown.
  • D. prototype bomber aircraft
    A prototype bomber aircraft is an experimental military airplane built to test and refine new bombing technologies, designs, and capabilities before potential mass production and operational deployment.
  • E. jet-powered hydroplane
    A jet-powered hydroplane is a high-speed watercraft that uses jet propulsion and a specialized hull design to skim across the water’s surface with minimal drag.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d381b0f97c819085c9b45799a5fb7c completed April 6, 2026, 9:49 a.m.
Created at: April 6, 2026, 11:25 a.m.