Triple

T10243135
Position Surface form Disambiguated ID Type / Status
Subject New York State Route 1A E243645 entity
Predicate historicalRouteType P66217 FINISHED
Object U.S. Route 1 alternate E617525 NE FINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: U.S. Route 1 alternate | Statement: [New York State Route 1A, historicalRouteType, U.S. Route 1 alternate]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: U.S. Route 1 alternate
Context triple: [New York State Route 1A, historicalRouteType, U.S. Route 1 alternate]
  • A. U.S. Route 1 Alternate chosen
    U.S. Route 1 Alternate is a major auxiliary route of U.S. Route 1 in Maryland that serves local traffic through urban and suburban areas parallel to the main highway.
  • B. U.S. Route 40 Alternate
    U.S. Route 40 Alternate is a scenic and historic alternate alignment of U.S. Route 40 that passes through several towns in Maryland, serving as a local main street and connector road.
  • C. U.S. Route 27 Alternate
    U.S. Route 27 Alternate is an auxiliary U.S. highway that provides an alternate north–south route to U.S. Route 27 through parts of Georgia and neighboring states.
  • D. U.S. Route 72 Alternate
    U.S. Route 72 Alternate is an auxiliary U.S. highway in northern Alabama that serves as an alternate east–west route to U.S. Route 72, connecting cities such as Decatur and Huntsville.
  • E. U.S. Route 199
    U.S. Route 199 is a U.S. highway in northern California and southern Oregon that connects U.S. Route 101 near Crescent City to Interstate 5 near Grants Pass, serving as a key route through the rugged interior.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: historicalRouteType
Context triple: [New York State Route 1A, historicalRouteType, U.S. Route 1 alternate]
  • A. historicRoute
    Indicates that a route has historical significance, typically due to its age, past usage, or role in notable events.
  • B. historicalType chosen
    Indicates that one entity classifies or characterizes another in terms of its role, status, or category within a historical context.
  • C. hasHistoricalRoute
    Indicates that an entity possesses or is associated with a route that has historical significance or origin.
  • D. historicalPass
    Indicates that an entity has successfully completed or passed a historical event, period, or examination related to history.
  • E. transportationTypeHistoricallyImportant
    Indicates that a mode of transportation has played a significant role or had notable impact in historical events, periods, or developments.
  • F. None of above.

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d381b0f97c819085c9b45799a5fb7c completed April 6, 2026, 9:49 a.m.
NER Named-entity recognition batch_69d4d328272c8190a3548d7f7f38cfc4 completed April 7, 2026, 9:49 a.m.
NED1 Entity disambiguation (via context triple) batch_69d7949f4f1c8190927bd184dd2a7a5a completed April 9, 2026, 11:59 a.m.
PD Predicate disambiguation batch_69d4d1ebd6c88190a1f3f4a72a99d6fe completed April 7, 2026, 9:44 a.m.
Created at: April 6, 2026, 11:25 a.m.