Triple

T10216433
Position Surface form Disambiguated ID Type / Status
Subject Portsmouth, Ohio E242454 entity
Predicate hasTransportation P105 FINISHED
Object U.S. Route 52 E598425 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: U.S. Route 52 | Statement: [Portsmouth, Ohio, hasTransportation, U.S. Route 52]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: U.S. Route 52
Context triple: [Portsmouth, Ohio, hasTransportation, U.S. Route 52]
  • A. U.S. Route 52 chosen
    U.S. Route 52 is a major United States highway running diagonally across the Midwest and Southeast, connecting cities from North Dakota to South Carolina.
  • B. U.S. Route 54
    U.S. Route 54 is a major northeast–southwest U.S. highway that runs from El Paso, Texas, to Griggsville, Illinois, passing through several states in the central United States.
  • C. U.S. Highway 53
    U.S. Highway 53 is a major north–south U.S. highway in the Upper Midwest that runs through Minnesota and Wisconsin, connecting cities such as Duluth with northern communities.
  • D. U.S. Route 72
    U.S. Route 72 is a major east–west U.S. highway in the southeastern United States that connects cities across Tennessee, Alabama, and Mississippi.
  • E. U.S. Route 501
    U.S. Route 501 is a U.S. Highway running through Virginia and North Carolina that serves as a key north–south transportation corridor connecting cities such as Durham and Myrtle Beach.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d381ae26c48190985abd0e25ee5d04 completed April 6, 2026, 9:49 a.m.
NER Named-entity recognition batch_69d3aa2894d0819095704449ecc2db6c completed April 6, 2026, 12:42 p.m.
NED1 Entity disambiguation (via context triple) batch_69fe64e2991c81908f474fe07a6ba10a completed May 8, 2026, 10:34 p.m.
Created at: April 6, 2026, 11:06 a.m.