Triple

T10214160
Position Surface form Disambiguated ID Type / Status
Subject MetalFX E242400 entity
Predicate instanceOf P0 FINISHED
Object Metal framework feature C18186 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Metal framework feature
Context triple: [MetalFX, instanceOf, Metal framework feature]
  • A. scaling framework
    A scaling framework is a structured approach that defines the principles, processes, and tools needed to grow a system, organization, or product efficiently and sustainably as demand increases.
  • B. architecturalFeature
    An architecturalFeature is a distinct physical or structural element of a building or built environment that contributes to its function, form, or aesthetic character.
  • C. mobile software framework
    A mobile software framework is a reusable set of libraries, tools, and APIs that provides a structured foundation for building, deploying, and maintaining applications on mobile operating systems.
  • D. UI framework
    A UI framework is a collection of tools, libraries, and components that provide a structured way to build, style, and manage user interfaces for applications.
  • E. game development framework chosen
    A game development framework is a reusable software platform that provides tools, libraries, and structures to simplify and accelerate the creation, testing, and deployment of video games across various platforms.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d381ae26c48190985abd0e25ee5d04 completed April 6, 2026, 9:49 a.m.
Created at: April 6, 2026, 11:04 a.m.