Triple
T10212298
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | 1935 Oscars |
E242357
|
entity |
| Predicate | eligibilityPeriodEndYear |
P214
|
FINISHED |
| Object | 1934 |
—
|
LITERAL FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 1934 | Statement: [1935 Oscars, eligibilityPeriodEndYear, 1934]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: eligibilityPeriodEndYear Context triple: [1935 Oscars, eligibilityPeriodEndYear, 1934]
-
A.
eligibilityPeriod
Indicates the span of time during which an entity qualifies for or is allowed to receive a particular benefit, service, or status.
-
B.
endYear
chosen
Indicates the year in which an event, state, or relationship comes to an end.
-
C.
effectiveYear
Indicates the calendar year in which something (such as a rule, status, or agreement) becomes valid or takes effect.
-
D.
activeYearsEndTime
Indicates the point in time when an entity’s period of activity or operation comes to an end.
-
E.
showEndYear
Indicates the year in which a show or series concluded or stopped airing.
- F. None of above.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d381ae26c48190985abd0e25ee5d04 |
completed | April 6, 2026, 9:49 a.m. |
| NER | Named-entity recognition | batch_69d3aa23bce881909b5deac612ec22cb |
completed | April 6, 2026, 12:42 p.m. |
| PD | Predicate disambiguation | batch_69d39559e5ac8190b88eca75956b7e6a |
completed | April 6, 2026, 11:13 a.m. |
Created at: April 6, 2026, 11:02 a.m.