Triple

T10212015
Position Surface form Disambiguated ID Type / Status
Subject OSIRIS-REx E242350 entity
Predicate sampleCurationFacility P92738 FINISHED
Object Johnson Space Center E14335 NE FINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Johnson Space Center | Statement: [OSIRIS-REx, sampleCurationFacility, Johnson Space Center]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Johnson Space Center
Context triple: [OSIRIS-REx, sampleCurationFacility, Johnson Space Center]
  • A. Johnson Space Center chosen
    Johnson Space Center is NASA’s primary hub for human spaceflight operations, astronaut training, and mission control in Houston, Texas.
  • B. Glenn Research Center
    Glenn Research Center is a major NASA research facility in Ohio specializing in aeronautics and space propulsion technologies.
  • C. Kennedy Space Center
    Kennedy Space Center is NASA’s primary launch complex for human spaceflight and robotic missions, located on Florida’s Atlantic coast.
  • D. Marshall Space Flight Center
    Marshall Space Flight Center is a major NASA field center in Huntsville, Alabama, responsible for developing space launch systems, propulsion technologies, and other key spaceflight hardware.
  • E. Kennedy Space Center Launch Control Center
    The Kennedy Space Center Launch Control Center is NASA’s primary facility for managing and overseeing countdown and launch operations for rockets departing from Florida’s Kennedy Space Center.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: sampleCurationFacility
Context triple: [OSIRIS-REx, sampleCurationFacility, Johnson Space Center]
  • A. servesFacility
    Indicates that one entity provides services or support to a particular facility as its client, target, or area of operation.
  • B. userFacility
    Indicates a relationship where a user is associated with, has access to, or operates within a particular facility.
  • C. basedOnFacility
    Indicates that something is determined, derived, or decided according to the characteristics, rules, or conditions of a particular facility.
  • D. consortiumFacility
    Indicates that a facility is jointly operated, managed, or shared by a consortium of organizations or entities.
  • E. practiceFacility
    Indicates that a location serves as a facility where individuals or groups regularly practice a particular activity, skill, or sport.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d381ae26c48190985abd0e25ee5d04 completed April 6, 2026, 9:49 a.m.
NER Named-entity recognition batch_69d3aa23bce881909b5deac612ec22cb completed April 6, 2026, 12:42 p.m.
NED1 Entity disambiguation (via context triple) batch_69d6f6f4d0cc8190ae41277b15b3012d completed April 9, 2026, 12:46 a.m.
PD Predicate disambiguation batch_69d39559e5ac8190b88eca75956b7e6a completed April 6, 2026, 11:13 a.m.
PDg Predicate description generation batch_69d3aa208c248190a0fb186b106389f3 completed April 6, 2026, 12:42 p.m.
Created at: April 6, 2026, 11:02 a.m.