Triple
T10208927
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Telegraphen-Bauanstalt von Siemens & Halske |
E242276
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | predecessor of Siemens AG |
C5829
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: predecessor of Siemens AG Context triple: [Telegraphen-Bauanstalt von Siemens & Halske, instanceOf, predecessor of Siemens AG]
-
A.
German industrialist
A German industrialist is a business leader or entrepreneur from Germany who owns, manages, or significantly influences large-scale industrial enterprises and their economic and social impact.
-
B.
German company
chosen
A German company is a business entity established under German law that operates for commercial, industrial, or professional purposes within Germany and potentially internationally.
-
C.
Krupp Trial defendant
A Krupp Trial defendant is an individual, typically an executive or manager of the Krupp industrial conglomerate, prosecuted in the post–World War II Nuremberg Military Tribunals for war crimes and crimes against humanity related to armaments production, exploitation of forced labor, and support of Nazi aggression.
-
D.
German engineer
A German engineer is a professional from Germany who applies scientific and mathematical principles to design, develop, and optimize technical systems, structures, or processes.
-
E.
Fraunhofer Institute
A Fraunhofer Institute is a research organization within the Fraunhofer Society that conducts applied scientific and engineering research to develop practical innovations for industry and society.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d381ae26c48190985abd0e25ee5d04 |
completed | April 6, 2026, 9:49 a.m. |
Created at: April 6, 2026, 10:59 a.m.