Triple

T10208925
Position Surface form Disambiguated ID Type / Status
Subject Telegraphen-Bauanstalt von Siemens & Halske E242276 entity
Predicate instanceOf P0 FINISHED
Object telegraph construction company C424 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: telegraph construction company
Context triple: [Telegraphen-Bauanstalt von Siemens & Halske, instanceOf, telegraph construction company]
  • A. telegraph operator
    A telegraph operator is a person who sends, receives, and decodes messages transmitted over telegraph systems using coded signals such as Morse code.
  • B. telecommunications company chosen
    A telecommunications company is an organization that provides communication services such as voice, data, and video transmission over wired or wireless networks to individuals and businesses.
  • C. telecommunications organization
    A telecommunications organization is an entity that provides communication services and infrastructure—such as voice, data, and internet connectivity—across distances using wired, wireless, or satellite networks.
  • D. bridge construction company
    A bridge construction company is a specialized engineering and construction firm that plans, designs, and builds bridges, managing all phases from feasibility studies and structural design to on-site construction and maintenance.
  • E. street railway company
    A street railway company is a business entity that owns, operates, and maintains streetcars or trams running on fixed rails along public streets to provide urban passenger transportation.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d381ae26c48190985abd0e25ee5d04 completed April 6, 2026, 9:49 a.m.
Created at: April 6, 2026, 10:59 a.m.